Courthouse Updates Bring Life to Historic Building

SKW provided a study to assist Daviess County with obtaining grant funding to upgrade the electrical system in the historic courthouse in downtown Gallitan, MO. SKW designed updated plumbing to bring the facilities into conformance with ADA guidelines. Work included additional insulation for the water lines and drain pipes, electrical panel schedule creation to note circuits used for the water heaters, and installation of a door sweep. The grant provided for additional designs to upgrade the main distribution panel and replace the 200A distribution panels with 225A panels and 400A panels. Conduit was reused where possible and new surface mounted raceway was installed for new loads.

Development

A vision is developed long before the ribbon-cutting ceremony.

Energy

Oil, gas, electricity – you expect compliant economical solutions for production.

Infrastructure

SKW takes great pride in helping both small towns and large cities prepare for the future.

Pipeline

Energy is the lifeblood of our economy. Pipelines keep America running strong.