Mission Road Bridge Design over Rock Creek
The Mission Road Bridge - prone to flooding during heavy rains - was replaced by a three-span reinforced concrete haunched slab bridge 150' in length, with span lengths of 45'-60'-45', a variable roadway width, and a variable skew located in a horizontal curve. The bridge is designed in accordance with APWA KC Metro standards to pass a 100-year flood event and features stone facade treatments, decorative railings and lights, and landscaping. This complex bridge project also involved the purchase and demolition of five flood-prone homes. SKW provided surveying, engineering, landscape architecture, and construction administration/observation services for the $5M construction project completed in 2009.
Featured Projects
3MGD Water Treatment Plant
From preliminary engineering to funding to construction observation - SKW does it all Read More
Tomahawk Storm Drainage Improvements
Construction observation is an important component in stormwater management Read More
Mission Road Bridge Design over Rock Creek
Replacement bridge reduces flooding for the City of Fairway, KS Read More
De Soto Wastewater System Improvements
Study of existing and potential sewer flow projections for pro-active community Read More




