Mission Road Bridge Design over Rock Creek
The signal span Mission Road Bridge - prone to flooding during heavy rains - was replaced by a three-span reinforced concrete haunched slab bridge 150' in length, with span lengths of 45'-60'-45', a variable roadway width, and a variable skew located in a horizontal curve. The bridge is designed in accordance with APWA KC Metro standards to pass a 100-year flood event and features stone facade treatments, decorative railings and lights, and landscaping. This complex bridge project also involved the purchase and demolition of five flood-prone homes. SKW provided surveying, engineering, landscape architecture, and construction administration/observation services for the $5M construction project completed in 2009. APWA awarded the 2009 Transportation Project of the Year Award in the $5M-25M Category to this project.
Featured Projects
Humphrey's Platte River Access Bridge #17500081
A new 451' long, 3-span, 2-lane, composite steel plate I-girder structure bridge Read More
Mission Road Bridge Design over Rock Creek
Replacement bridge reduces flooding for the City of Fairway, KS Read More
Cuivre River Bridge #21600061 Replacement
SKW has worked on bridge projects in over 35 Missouri counties Read More
Middle Fork Tebo Creek Bridge #18100061
Bridge design requires team work between private, local and state authorities Read More




