Middle Fork Tebo Creek Bridge #18100061
SKW provided the Henry County Commission with the design for the replacement bridge for Bridge No. 1810006 located over the Middle Fork Tebo Creek. The structure was a 3-span, 20' wide bridge with precast double tee girders and a cast-in-place concrete deck, and was funded through the BRO program. SKW services included surveying, preliminary/final design, right-of-way and construction plans, easement acquisition assistance, bidding services, and construction observation and administration. During the construction phase of this project SKW worked closely with the contractor and the county to modify the foundation design to better suit the actual conditions encountered upon groundbreaking.
Featured Projects
Humphrey's Platte River Access Bridge #17500081
A new 451' long, 3-span, 2-lane, composite steel plate I-girder structure bridge Read More
Mission Road Bridge Design over Rock Creek
Replacement bridge reduces flooding for the City of Fairway, KS Read More
Cuivre River Bridge #21600061 Replacement
SKW has worked on bridge projects in over 35 Missouri counties Read More
Middle Fork Tebo Creek Bridge #18100061
Bridge design requires team work between private, local and state authorities Read More




